11.3.3 Major schemes awaiting Programme Entry

11.3.3.1 The table below shows major schemes that are awaiting programme entry and have forecast spend for the LTP2 period.

  Description Total Anticipated Cost

Progress

Objectives and Outcomes
Retaining Walls Replacement of existing failing sub-standard dry stone highway retaining walls & parapets £35m A draft of the major scheme business case was submitted in November 2008 Improve existing strategic and other important local routes throughout the east of the contribution.
SEMMMS New Relief Road Scheme encompassing Hazel Grove bypass, Poynton bypass and Manchester Airport Eastern Link Road £600.8m Significant work underway at meeting DfT requirements (see SEMMMS appendix)

Improving Connectivity

Reducing journey times

Improving access to employment sites