11.3.3 Major schemes awaiting Programme Entry
11.3.3.1 The table below shows major schemes that are awaiting programme entry and have forecast spend for the LTP2 period.
| Description | Total Anticipated Cost |
Progress |
Objectives and Outcomes | |
|---|---|---|---|---|
| Retaining Walls | Replacement of existing failing sub-standard dry stone highway retaining walls & parapets | £35m | A draft of the major scheme business case was submitted in November 2008 | Improve existing strategic and other important local routes throughout the east of the contribution. |
| SEMMMS New Relief Road | Scheme encompassing Hazel Grove bypass, Poynton bypass and Manchester Airport Eastern Link Road | £600.8m | Significant work underway at meeting DfT requirements (see SEMMMS appendix) |
Improving Connectivity Reducing journey times Improving access to employment sites |